CONFEDERATE PT RD over BUTCHER PIN CREEK
0.2 MI E OF BLANDING BLVD · County 031, Florida · Built 1970 · 2 Lanes · 9,641 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
30.264825, -81.734683
This bridge is in worse condition than 94% of bridges in County 031. The average bridge in Florida is 0 years old; this one is 56 years old.
Nearby Bridges
SR-21 S.B. over CEDAR RIVER
Built 2002
SR-21 NB over CEDAR RIVER
Built 1967
HYDE PARK ROAD over WILLIAMSON CREEK
Built 1965
SR-134 (TIMUQUANA) over FISHING CREEK
Built 1978
SR-128 (SAN JUAN) over CEDAR CREEK
Built 1963
US-17 SB (SR-15) over ORTEGA RIVER & RD.
Built 1972
US-17 NB (SR-15) over ORTEGA RIVER & RD.
Built 1972
LAKESIDE DRIVE over ORTEGA RIVER CANAL
Built 2020
SR-21 over TRIB. OF FISHING CREEK
Built 1974
110TH STREET over FISHING CREEK
Built 1979
Bridge Details
- Structure #
- 724088
- Year Built
- 1970
- Length
- 43.9 m (144 ft)
- Max Span
- 11 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,641
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $285,000
- Total Project Cost
- $14,365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.