SR-105/SR-A1A over SIMPSON CREEK

SR-105 OVER SIMPSON CREEK · County 031, Florida · Built 2022 · 1 Lanes · 5,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
720856
Year Built
2022
Length
38.7 m (127 ft)
Max Span
12.9 m
Width
17.5 m (57.4 ft)
Lanes
1
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.