I-95 SB Ramp over I-95/SR-202 WB

I-95 SB TO SR 202 EB · County 031, Florida · Built 2017 · 2 Lanes · 27,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
720816
Year Built
2017
Length
409 m (1341.9 ft)
Max Span
70.4 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
27,000
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.