NEW WORLD AVE 44.3 over SR 23
NEW WORLD AVE/SR 23 · County 031, Florida · Built 2018 · 5 Lanes · 5,800 vehicles/day
Overall
Deck
9
Excellent
Superstructure
7
Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 7 | Good |
| Substructure | 9 | Excellent |
Location
30.276889, -81.876556
This bridge is in worse condition than 22% of bridges in County 031. The average bridge in Florida is 0 years old; this one is 8 years old.
Nearby Bridges
SR 23 SB RAMP 43.0 over NORMANDY DRAIN
Built 2018
SR 23 NB/SB 42.9 over NORMANDY DRAIN
Built 2009
SR-228 Normandy over SR-23
Built 2017
SR-228-NORMANDY WB over SR-23
Built 2016
SR-23 SB over I-10 (SR-8)
Built 2016
I-10 WB TO SR-23 over I-10 (SR-8)
Built 2009
SR-23 NB over I-10 (SR-8)
Built 2009
HALSEMA RD. over I-10 (SR-8)
Built 2009
CHAFFEE ROAD over MCGIRTS CREEK
Built 1992
I-10 EB (SR-8) over CSXRR (ABANDONED)
Built 1960
Bridge Details
- Structure #
- 720809
- Year Built
- 2018
- Length
- 74.5 m (244.4 ft)
- Max Span
- 41 m
- Width
- 31.4 m (103 ft)
- Lanes
- 5
- Daily Traffic
- 5,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.