I-95 NB CD over FOREST STREET

I-95 CD OVER FOREST ST. · County 031, Florida · Built 2008 · 4 Lanes · 17,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
720655
Year Built
2008
Length
46.8 m (153.5 ft)
Max Span
46.8 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
17,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.