ALTA DRIVE over TERRAPIN CREEK
1.3 MI NW OF NEW BERLIN · County 031, Florida · Built 1982 · 2 Lanes · 3,600 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
30.428769, -81.580292
This bridge is in worse condition than 94% of bridges in County 031. The average bridge in Florida is 0 years old; this one is 44 years old.
Nearby Bridges
I-295 NB (SR-9A) over ALTA DR.
Built 1993
I-295 SB (SR-9A) over ALTA DR.
Built 1993
I-295 (SR-9A) SB over TERRAPIN CREEK
Built 1993
I-295 (SR-9A) NB over TERRAPIN CREEK
Built 1984
I-295 SB (SR-9A) over DUNN CREEK & CSXRR
Built 1994
I-295 NB (SR-9A) over DUNN CREEK & CSXRR
Built 1984
I-295 SB (SR-9A) over DAVIS RD.
Built 1994
I-295 NB (SR-9A) over DAVIS RD.
Built 1983
I-295 NB (SR-9A) over NEW BERLIN RD. & CSXRR
Built 1984
I-295 SB (SR-9A) over NEW BERLIN RD. & CSXRR
Built 1993
Bridge Details
- Structure #
- 720500
- Year Built
- 1982
- Length
- 33.5 m (109.9 ft)
- Max Span
- 8.4 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 3,600
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.