I-295 NB (SR-9A) over WHEAT RD.

0.5 MI. S. OF 103rd ST. · County 031, Florida · Built 1970 · 3 Lanes · 33,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
720345
Year Built
1970
Reconstructed
1994
Length
40.8 m (133.9 ft)
Max Span
16.8 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
33,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.