I-95 SB (SR-9) over CEDAR CREEK

I-95 SB / CEDAR CREEK · County 031, Florida · Built 1968 · 3 Lanes · 41,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
720230
Year Built
1968
Reconstructed
1992
Length
68.3 m (224.1 ft)
Max Span
9.8 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
41,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.