I-95 (SR-9) over MYRTLE AVE/I-95/I-10 RMP

I-95 OVER MYRTLE AVE. · County 031, Florida · Built 1955 · 4 Lanes · 150,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
720163
Year Built
1955
Length
436 m (1430.4 ft)
Max Span
117.5 m
Width
26.6 m (87.3 ft)
Lanes
4
Daily Traffic
150,500
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,852,000
Total Project Cost
$2,680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.