SR-115 SB over RIBAULT RIVER

SR-115 OVER RIBAULT RIVER · County 031, Florida · Built 1961 · 2 Lanes · 13,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
720032
Year Built
1961
Length
227.7 m (747 ft)
Max Span
18.6 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
13,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,004,000
Total Project Cost
$1,506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.