SR-105 SB over I-95 (SR-9)

SR-105 SB OVER I-95 · County 031, Florida · Built 1959 · 1 Lanes · 6,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
720023
Year Built
1959
Length
71.9 m (235.9 ft)
Max Span
22.3 m
Width
10.4 m (34.1 ft)
Lanes
1
Daily Traffic
6,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$42,000
Total Project Cost
$42,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.