SR 23 SB over CSX RR

0.33 MI S of US 17 · County 019, Florida · Built 2022 · 2 Lanes · 17,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
710136
Year Built
2022
Length
43.9 m (144 ft)
Max Span
43.9 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
17,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.