I-95 SB over C-54 Canal

Buffer Preserve Drive · County 009, Florida · Built 2012 · 3 Lanes · 28,290 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
700237
Year Built
2012
Length
107.9 m (354 ft)
Max Span
35.8 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
28,290
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.