US-1 over Sebastian River

US-1 over Sebastian River · County 009, Florida · Built 2008 · 4 Lanes · 14,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
700224
Year Built
2008
Length
299.6 m (982.9 ft)
Max Span
27.1 m
Width
32.7 m (107.3 ft)
Lanes
4
Daily Traffic
14,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.