I-95 NB over SR-518

I-95 NB SR-518 · County 009, Florida · Built 1964 · 3 Lanes · 49,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
700122
Year Built
1964
Reconstructed
2009
Length
46.1 m (151.2 ft)
Max Span
24 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
49,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.