SR-528 39.252 over Ryans Canal

2.7 MI WEST OF SR-9 I-95 · County 009, Florida · Built 1973 · 4 Lanes · 44,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
700086
Year Built
1973
Reconstructed
2022
Length
14.2 m (46.6 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
44,000
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.