I10 SR8 over SR77

2.5Mi. S of US90 SR10 · County 133, Florida · Built 1975 · 2 Lanes · 11,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
610070
Year Built
1975
Length
64.1 m (210.3 ft)
Max Span
21.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
11,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.