Green Road over Sweetwater Creek

2.1 Mi NE of CR 191 · County 113, Florida · Built 1960 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
584065
Year Built
1960
Length
34.7 m (113.8 ft)
Max Span
4.3 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
75
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.