SR10 US90 over Simpson River

2.5Mi E of County line · County 113, Florida · Built 2024 · 2 Lanes · 20,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
580235
Year Built
2024
Length
342.4 m (1123.4 ft)
Max Span
20.3 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
20,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.