CR67 over Yellow Creek

7.2 Miles East of SR65 · County 077, Florida · Built 2023 · 2 Lanes · 550 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
564069
Year Built
2023
Length
61 m (200.1 ft)
Max Span
15.3 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.