SR20 over Telogia Creek Relief

8.4 Mi W of SR65 · County 077, Florida · Built 1990 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
560060
Year Built
1990
Length
50.9 m (167 ft)
Max Span
8.8 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
4,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.