CR 368 over Porter Lake Relief

2.4 Miles East of CR 67 · County 077, Florida · Built 1964 · 2 Lanes · 250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
560011
Year Built
1964
Reconstructed
1984
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.