SR263 SB over Bradford Brook

0.25 MI S of SR371 · County 073, Florida · Built 2024 · 3 Lanes · 14,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
550180
Year Built
2024
Length
12.8 m (42 ft)
Max Span
12.8 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
14,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.