US27 SR63 SB over I10 SR8

3.28 Mi. E. of SR-263 · County 073, Florida · Built 1974 · 4 Lanes · 19,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
550068
Year Built
1974
Reconstructed
2009
Length
113.9 m (373.7 ft)
Max Span
40.4 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
19,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.