Oneal Trail over Jones Mill Creek

5.0 Mi S of Walker Spring · County 065, Florida · Built 2004 · 2 Lanes · 165 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
544085
Year Built
2004
Length
13.7 m (44.9 ft)
Max Span
6.9 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
165
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.