SR91 over Chattahoochee River

GA-FL State Line · County 063, Florida · Built 1956 · 2 Lanes · 2,020 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
53GA96
Year Built
1956
Length
485.2 m (1591.9 ft)
Max Span
46.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,020
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,220,000
Total Project Cost
$9,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.