SR73 over Dry Creek

3.1 Mi. South of I10 SR8 · County 063, Florida · Built 1980 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
530089
Year Built
1980
Length
140.7 m (461.6 ft)
Max Span
10.8 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.