CR275 over I10 SR8

7.0 Mi East of SR71 · County 063, Florida · Built 1976 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
530064
Year Built
1976
Length
82 m (269 ft)
Max Span
29.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.