CR65A over Juniper Creek

3.33MI West of SR65 · County 039, Florida · Built 2020 · 2 Lanes · 182 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

30.530306, -84.737528

This bridge is in worse condition than 28.9% of bridges in County 039. The average bridge in Florida is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
504156
Year Built
2020
Length
28.2 m (92.5 ft)
Max Span
14.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
182
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.