Chestnut Road over Dry Creek

0.9 Mi North of CR 182 · County 033, Florida · Built 1967 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
484032
Year Built
1967
Length
14.3 m (46.9 ft)
Max Span
4.9 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
150
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.