SR291 over Carpenter Creek
1.5 MI South of I10 · County 033, Florida · Built 2002 · 5 Lanes · 33,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.483919, -87.22275
This bridge is in worse condition than 26.6% of bridges in County 033. The average bridge in Florida is 0 years old; this one is 24 years old.
Nearby Bridges
SR750 Airport Blvd over Carpenters Creek
Built 1976
SR750 Airport Blvd over I110 SR8A
Built 1964
I110 SR8A over Carpenter Creek
Built 1964
SR296 over Carpenter Creek
Built 1969
I110 SR8A over SR296 Brent Lane
Built 2009
SR742 Creighton RD over I110
Built 2005
SR289 over Carpenter Creek
Built 2022
SR742 Burgess Rd over Carpenter Creek
Built 1967
SR296 Brent Lane over CSX RR and City Streets
Built 1967
I110 SR8A over SR291 Davis Highway
Built 2004
Bridge Details
- Structure #
- 480194
- Year Built
- 2002
- Length
- 30 m (98.4 ft)
- Max Span
- 30 m
- Width
- 24 m (78.7 ft)
- Lanes
- 5
- Daily Traffic
- 33,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.