US98 SR30 over Philips Inlet
Walton-Bay County Line · County 005, Florida · Built 1989 · 2 Lanes · 14,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.273417, -85.985292
This bridge is in worse condition than 45% of bridges in County 005. The average bridge in Florida is 0 years old; this one is 37 years old.
Nearby Bridges
US98 SR30 over Philips Inlet
Built 1996
Camp Helen Trail over Phillips Inlet
Built 1996
Wild Heron Way over Powell Lake
Built 2022
CR 30A over Camp Creek Lake
Built 2003
CR 30A over Deer Lake
Built 1970
E County Hwy 30A over Deer Lake
Built 2024
CR 30A over Eastern Lake
Built 1998
SR79 over Ward Creek
Built 2005
Walton Street over Unnamed Branch
Built 2003
SR79 over ICWW at West Bay
Built 2008
Bridge Details
- Structure #
- 460072
- Year Built
- 1989
- Length
- 621.7 m (2039.7 ft)
- Max Span
- 21.4 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 14,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $155,000
- Total Project Cost
- $155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.