US231 SR75 over Bear Creek

8.3 Miles South of SR20 · County 005, Florida · Built 1973 · 2 Lanes · 7,150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
460063
Year Built
1973
Length
83.8 m (274.9 ft)
Max Span
7.6 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
7,150
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.