CR 231 over New River

5.25 Mi S of SR 121 · County 125, Florida · Built 2021 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
394009
Year Built
2021
Length
109.7 m (359.9 ft)
Max Span
18.3 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
2,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.