CR 229 over NEW RIVER

2 MI SE OF SR 121 · County 125, Florida · Built 2007 · 2 Lanes · 750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

30.037353, -82.221964

This bridge is in worse condition than 50% of bridges in County 125. The average bridge in Florida is 0 years old; this one is 19 years old.

Nearby Bridges

Bridge Details

Structure #
394007
Year Built
2007
Length
160 m (524.9 ft)
Max Span
22.9 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.