US-19 NB (SR-20) over ECONFINA RIVER

12.7 MI. N. OF PERRY · County 123, Florida · Built 1953 · 2 Lanes · 3,050 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
380060
Year Built
1953
Length
77.7 m (254.9 ft)
Max Span
4.6 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,050
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$345,000
Total Project Cost
$515,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.