US-19 SB (SR-55) over FENHOLLOWAY RIVER

0.1 MI. S. OF CR-30 · County 123, Florida · Built 1959 · 2 Lanes · 4,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
380025
Year Built
1959
Length
64 m (210 ft)
Max Span
9.1 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
4,750
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$282,000
Total Project Cost
$423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.