I-75 SB (SR-93) over SUWANNEE RIVER OVERFLOW

6.9 MI. N. OF I-10 · County 121, Florida · Built 1962 · 3 Lanes · 20,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
370002
Year Built
1962
Reconstructed
1997
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
20,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.