I-75 over SR-200

I-75 over SR-200 · County 083, Florida · Built 1996 · 6 Lanes · 95,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

29.150147, -82.185169

This bridge is in worse condition than 61.5% of bridges in County 083. The average bridge in Florida is 0 years old; this one is 30 years old.

Nearby Bridges

Bridge Details

Structure #
360063
Year Built
1996
Length
74.8 m (245.4 ft)
Max Span
37.4 m
Width
41.2 m (135.2 ft)
Lanes
6
Daily Traffic
95,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.