CR 53 over NORTON CREEK

1.2 MI SOUTH OF I-10 · County 079, Florida · Built 2007 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
354043
Year Built
2007
Length
30.6 m (100.4 ft)
Max Span
10.2 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.