CR 158 over SUNDOWN CREEK

3 MI EAST OF US 221 · County 079, Florida · Built 1919 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
350016
Year Built
1919
Reconstructed
2017
Length
17.7 m (58.1 ft)
Max Span
17.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$310,000
Total Project Cost
$465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.