US-129 (SR-51) over I-75 (SR-93)

4 Mi N OF CR-132 · County 047, Florida · Built 1962 · 2 Lanes · 4,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
320011
Year Built
1962
Length
74.4 m (244.1 ft)
Max Span
24.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
4,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$328,000
Total Project Cost
$492,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.