SE 49th AVE over SANTA FE TRIBUTARY

0.41 MI. S OF SE CR-18 · County 007, Florida · Built 2022 · 2 Lanes · 101 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
284036
Year Built
2022
Reconstructed
2024
Length
9.3 m (30.5 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
101
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.