I-75 NB (SR-93) over CR-235 & CSX RR

2 MI. S. OF US-441 · County 001, Florida · Built 1963 · 3 Lanes · 34,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
260071
Year Built
1963
Reconstructed
1994
Length
83.2 m (273 ft)
Max Span
17.7 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
34,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.