I-75 (SR-93) NB over TOLEDO BLADE BOULEVARD
8.0 MI N OF CHARLOTTE CL · County 115, Florida · Built 1981 · 3 Lanes · 27,750 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.098983, -82.155517
This bridge is in worse condition than 23.1% of bridges in County 115. The average bridge in Florida is 0 years old; this one is 45 years old.
Nearby Bridges
I-75 SB (SR-93) over TOLEDO BLADE BOULEVARD
Built 1981
TROPICAIRE BLVD over CREIGHTON CANAL
Built 1997
I-75 over COSMIC WATERWAY
Built 1981
TROPICAIRE BLVD over COSMIC CANAL
Built 1997
TOLEDO BLADE SB over SNOVER CANAL
Built 2008
CHAMBERLAIN BLVD. over SNOVER WATERWAY
Built 1971
TOLEDO BLADE NB over SNOVER CANAL
Built 1982
CRANBERRY BLVD. over SNOVER WATERWAY
Built 1970
PANACEA BLVD over SNOVER WATERWAY
Built 2006
SALFORD BLVD. over SNOVER WATERWAY
Built 1971
Bridge Details
- Structure #
- 170140
- Year Built
- 1981
- Reconstructed
- 2004
- Length
- 57.9 m (190 ft)
- Max Span
- 32.8 m
- Width
- 18 m (59.1 ft)
- Lanes
- 3
- Daily Traffic
- 27,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $400,000
- Total Project Cost
- $440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.