I-75 (SR-93) NB over TOLEDO BLADE BOULEVARD

8.0 MI N OF CHARLOTTE CL · County 115, Florida · Built 1981 · 3 Lanes · 27,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
170140
Year Built
1981
Reconstructed
2004
Length
57.9 m (190 ft)
Max Span
32.8 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
27,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000
Total Project Cost
$440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.