SR-681 SB over US-41

3.1MI W OF I-75 · County 115, Florida · Built 1981 · 2 Lanes · 6,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
170098
Year Built
1981
Length
169 m (554.5 ft)
Max Span
55.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.