I-75 (SR-93) NB over JACARANDA BLVD

2.5MI. S OF LAUREL RD. · County 115, Florida · Built 1979 · 4 Lanes · 41,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
170095
Year Built
1979
Reconstructed
2008
Length
66.8 m (219.2 ft)
Max Span
40.5 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
41,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.