FRUITVILLE RD. over COW PEN SLOUGH

6 MI E/O I-75 · County 115, Florida · Built 1971 · 2 Lanes · 5,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
170030
Year Built
1971
Length
42.8 m (140.4 ft)
Max Span
10.7 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
5,200
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.