SR-542 (DUNDEE RD) over EASTWOOD DRAIN
3.4MI W/O US-27 · County 105, Florida · Built 2021 · 4 Lanes · 13,100 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
28.022542, -81.684614
This bridge is in worse condition than 29.2% of bridges in County 105. The average bridge in Florida is 0 years old; this one is 5 years old.
Nearby Bridges
SR-540 over LAKE INA
Built 2002
CRUMP ROAD over PEACE RIVER DRAINAGE
Built 1960
W LAKE HAMILTON RD over MARGRETS CANAL
Built 1960
CRUMP RD. over CRUMP CREEK
Built 1960
W LAKE ELOISE DR over LULU ELOISE CANAL
Built 1996
SR-542 over Peace Creek
Built 2022
HELENA ROAD over HELENA CANAL
Built 2010
LAKE HOWARD DRIVE over LAKE MAY CANAL
Built 1998
AVENUE N SW over LAKE MAY CANAL
Built 1998
US-17 (SR-555) over CSX RR & LK SHIPP CANAL
Built 1995
Bridge Details
- Structure #
- 160529
- Year Built
- 2021
- Length
- 7.3 m (24 ft)
- Max Span
- 3.7 m
- Lanes
- 4
- Daily Traffic
- 13,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.