US-92 over Lk Parker Drainage Canal

1.3 MI E/O COMBEE RD · County 105, Florida · Built 2016 · 4 Lanes · 34,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
160349
Year Built
2016
Reconstructed
2017
Length
16.2 m (53.1 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
34,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.